Anteater Parking Structure

Construction Start Date: September 2004
Construction End Date: January 3, 2006

Latest Updates

The Anteater Parking Structure opened on January 3, 2006.

General Information

Anteater PS is a seven-level parking structure with almost 2,000 spaces. Patrons are able to access the third level of the parking structure from the new Peltason Drive/Southern Radial intersection, and the first level via the service road adjacent to the Engineering Laboratory Facility.

Anteater Drive has been completed and runs from Bonita Canyon Road/Culver to the new structure at East Peltason.

East Peltason Drive will be widened between Student Health and the new parking structure during Summer 2005.

Four-Story Multi-purpose Office Building

A new, four-story office building will be constructed along the south side of the new parking structure (facing University Hills). The new building will provide the campus with additional office and classroom space. The office building will be completed after the parking structure opens.
* Click Here to see some EPS Fun Facts *
Click on the thumbnails below to view a larger picture
Proposed Site (Overhead)
Proposed Site (Radial)
Overhead Area Rendering
1st Floor Plan
3rd Floor Plan
Extended Area Rendering
9/04 Ground Site
11/04 Site Preparation
1/05 Columns-A-Plenty
2/05 Ground Level Slab
2/05 Second Level Underway
3/05 Third Level Underway
4/05 Upper Deck Ready to Pour
4/05 Special Concrete Conveyor
4/05 Fourth Level Underway
UCI Parking and Transportation Services
200 Public Services Building
Irvine, CA 92697-4525
Phone: (949) 824-7275      Fax: (949) 824-2387
Office Hours: Monday - Friday 7:30 AM - 4:00 PM
Policies and Procedures | Privacy and Legal Notice | Contact Webmaster | UCI Home | A&BS